Past Performance
Detailed information on a selection of ECLIPS’s (formerly Sea Box International) past projects:
- Australian Defence Force Army HQ — JMILS Demonstration
- Australian Defence Force — COVID-19 Response Shelters
- Australian Defence Force — ATM CROP and JMIC
- Shell Darwin — Supply of 40 ft Container Roll-Out Warehousing System (CROWS™)
- Australian Defence Force Army HQ — Supply of JMIC Drawers and Shelves
- Australian Defence Force Army HQ — Supply of Container Roll Out Platforms (CROP) and Joint Modular Intermodal Containers (JMIC)
- Australian Defence Force RPDE — Task 59 155 mm Ammunition Unit Load Carrier (ULC)
- Australian Defence Force LAND 121 Contract — ISO 1C Flatracks (2157 units) and Cargo Gate Kits
- Chevron Australia — Container Roll-Out Warehousing System (CROWS) x 4000 units
- Chevron KJV Projects
- TFTA UOTF Projects
- Atlas Wodgina Kitchen Expansion Project
- Australian Navy Generator Modules
- Manitowoc 80 tonne Crane CES Carriage and Stowage Solution
- Cyclone Shelters
- MHOV Project — Flatracks
- Australian Army — Supply of Waste Water Treatment Plant (WWTP) to AACAP 2019
- DTSO Transportable Field Trials Laboratory (TFTL)
- Agilent Technologies — Equipment Calibration Laboratory
- ADF Maritime Surveillance Tonga — Accommodation Module
- 25 tonne Crane Spreader Bar
- Defence Innovation Hub — Army Innovation Day 2021 Condition Based Maintenance Software System (CBMSS)
- Defence Innovation Hub — Digitalisation of the Joint Modular Intermodal Logistics System (D-JMILS) Ph2
- Hanwha LAND 400-3 — Integrated Logistics Support Services Risk Mitigation Activity (RMA)
- Hanwha LAND 400-3 — Offboard Health and Usage Monitoring System (HUMS)
- Hanwha LAND 400-3 — Vehicle Information Management System (VIMS)
- Camcode — Army Headquarters Codification and Unique Identification Program
Australian Defence Force Army HQ — JMILS Demonstration
Description of Product or Service Provided | Description of Contract: Manufacture and supply of Joint Modular Intermodal Logistics System (JMILS) equipment, including: single and double Joint Modular Intermodal Containers (JMIC), single and double JMIC lift adaptors, Container Roll Out Platforms (CROP), Stackable Plastics Cases (SPC) 122 and 124, CROP cover kits, 4 JMIC Interface Platforms (JIP), 6 JIP, 20 ft standard containers, 20 ft side-opening containers, JMIC shelves, Camcode labels, 20 ft MK1 Container Roll-Out Warehousing System (CROWS™) including legs and accessories, and scale models of equipment supplied. ![]() |
Contract Dates | Start: 1 March 2019 Finish: 29 February 2020 |
Australian Defence Force — COVID-19 Response Shelters
Description of Product or Service Provided | Description of Contract: Design and prototype an Australian-made capability, for which multiple isolation shelter kits and body storage kits can be produced and deployed for the COVID-19 response, by using both the kits and locally sourced shipping containers and refrigeration containers in order to provide expedient shelters. The Australian Government will have access to smart emergency shelter stock, allowing it to respond to future emergencies locally or overseas, leveraging excess shipping containers and the baseline kits. ![]() ![]() |
Contract Dates | Start: 13 April 2020 Finish: 19 June 2020 |
Australian Defence Force — ATM CROP and JMIC
Description of Product or Service Provided | Description of Contract: Manufacture and supply of Container Roll Out Platforms (CROP), CROP cover kits, Joint Modular Intermodal Containers (JMIC), short and tall drawer assemblies to be mounted inside JMICs. ![]() |
Contract Dates | Start: 30 October 2017 Finish: 7 July 2019 |
Shell Darwin — Supply of 40 ft Container Roll-Out Warehousing System (CROWS™)
Description of Product or Service Provided | Description of Contract: Supply of 40 ft CROWS, CROWS Legs, and 40 ft containers. |
Contract Dates | Start: December 2017 Finish: April 2018 |
Australian Defence Force Army HQ — Supply of JMIC Drawers and Shelves
Description of Product or Service Provided | Description of Contract: Supply of:
|
Contract Dates | Start: May 2018 Finish: October 2018 |
Australian Defence Force Army HQ — Supply of Container Roll Out Platforms (CROP) and Joint Modular Intermodal Containers (JMIC)
Description of Product or Service Provided | Description of Contract: Army to purchase Container Roll Out Platforms (CROPs) and Joint Modular Intermodal Containers (JMICs). |
Contract Dates | Start: 30 October 2017 Finish: 30 May 2018 |
Australian Defence Force RPDE — Task 59 155 mm Ammunition Unit Load Carrier (ULC)
Description of Product or Service Provided | Description of Contract: The purpose of RPDE Task 59 is to develop a prototype Unit Load Carrier (ULC) that can carry a quantity of 155 mm ammunition Configuration Items (CIs) in a single load through the Australian Defence Force (ADF) supply chain. To achieve this ECLIPS designed an internal retention system for unguided and guided 155 mm Ammunition CI that can be secured inside a Joint Modular Intermodal Container (JMIC). An integration platform was designed to allow the ULC to interface with the in-service ISO 1C Flatrack. To ensure maximum flexibility of deployment throughout the ADF supply chain ECLIPS developed the interface platform to attach the JMIC to the ISO 1C Flatrack in 8 JMIC and 2 JIMC configurations. These two systems will be known as Full Length ISO 1C Flatrack Adaptor (8 x JMIC) and Twin JMIC Interface Platform (2 x JMIC) as per the contract deliverables table. |
Contract Dates | Start: 23 December 2016 Finish: 2 March 2018 |
Australian Defence Force LAND 121 Contract — ISO 1C Flatracks (2157 units) and Cargo Gate Kits
Description of Product or Service Provided | Description of Contract: Design and build 2157 ISO 1C flatracks in accordance with the DMO specification, following the full DMO Design Review and Verification/Validation process. The contract also includes Cargo Gate Kits. ECLIPS employs a standalone team of five personnel to manage this contract as well as the NZDF Flatrack contract. The contract has been in place for over 27 months, in which ECLIPS has successfully navigated:
In the following 12 months ECLIPS initiated delivery of main production batches. ![]() View project in Showcase |
Contract Dates | Start: 28 January 2014 Finish: October 2017 |
Chevron Australia — Container Roll-Out Warehousing System (CROWS™) x 4000 units
Description of Product or Service Provided | Description of Contract: Design and build the 20 ft and 40 ft Container Roll-Out Warehousing System (CROWS™) specifically to meet the functional requirements of logistics operations on Barrow Island (Gorgon Project). This also involved the conduct of a Design Review Process and V&V program to satisfy Chevron that the platforms are fit for purpose. From initial customer engagement to the delivery of 4000 units to Chevron Supply Base in Perth, the project duration was 11 months. This project is complete and since delivery in September 2014, ECLIPS has designed and delivered 100 x 40 ft CROWS, and designed and tested the 45 ft CROWS and the Pipe Intermodal Logistics System (PILS) — both have been accepted by Chevron as baseline products and ECLIPS is now looking to conduct field trials with these products. ![]() View project in Showcase |
Contract Dates | Start: 7 April 2014 Finish: September 2014 |
Chevron KJV Projects
Description of Product or Service Provided | Description of Contract: Supply and delivery of a large quantity of various shipping containers, logistic platforms and reefer containers to Chevron Australia for the Gorgon project on Barrow Island, Western Australia. The containers were modified to meet strict Australian Quarantine requirements that were in place for Barrow Island. List of products delivered as below:
![]() |
Contract Dates | Start: 9 February 2009 Finish: mid 2010 |
TFTA UOTF Projects
Description of Product or Service Provided | Description of Contract: Design, construction and delivery of a realistic combined arms combat team urban operations training facility (UOTF) for the Australian Defence Force, by using modified shipping containers, to enhance the relevance of Mission Rehearsal Exercise for units about to deploy on operations. ![]() View project in Showcase |
Contract Dates | Start: July 2008 Finish: September 2009 |
Atlas Wodgina Kitchen Expansion Project
Description of Product or Service Provided | Description of Contract: Design and construction of a 400 square metre kitchen and temporary dining facility to serve 1980 meals per day at a mining camp at Wodgina (near Port Hedland), Western Australia. The facility was constructed using container based modules that were prefabricated, delivered to site, and remaining internal kitchen fit out completed. ECLIPS then undertook a refurbishment of the existing dining facility whilst the temporary dining modules were used. The temporary dining modules were removed from site at completion and handover of refurbished dining hall. ![]() View project in Showcase |
Contract Dates | Start: 4 November 2013 Finish: 9 December 2013 |
Australian Navy Generator Modules
Description of Product or Service Provided | Description of Contract: Design and build five 20 ft container-based training modules for the Australian Navy, to be used as a deployable training facility to allow students to dismantle, repair, assemble and test the fitted Cummins 20KVA diesel generator. The module featured:
This project was delivered on budget and on time. The facility has been in service since June 2013 and is currently being fully utilised as part of the Navy's technician training program at HMAS Cerberus in Victoria, Australia. From signing of contract to delivery took four months. ![]() View project in Showcase |
Contract Dates | Start: 26 February 2013 Finish: September 2013 |
Manitowoc 80 tonne Crane CES Carriage and Stowage Solution
Description of Product or Service Provided | Description of Contract: Design and build eight attachment frames and canvas cover kits to carry Grove 80T Crane CES equipment to suit ISO 1C Flatracks as developed for Land 121 Phase 3B contract. The contract also included supply of eight ISO 1C Flatracks. The attachment frames and canvas cover kits are designed to fit the flatracks without modification. ![]() View project in Showcase |
Contract Dates | Start: 24 June 2015 Finish: June 2016 |
Cyclone Shelters
Description of Product or Service Provided | Description of Contract: Design and build six cyclone-rated shelters compliant to the Queensland Government Design Guidelines for Queensland Public Cyclone Shelters, to provide a safe environment for up to 40 people per module for the duration of a cyclone, in a wind Region D rated area. Each module uses a core of two modified 40 ft high-cube shipping containers to make the shelters fully transportable. The cyclone shelters includes a weighted inbuilt footing system, passive ventilation, air conditioning, water supply and waste storage, toilet, and kitchen facilities. The shelters are also non-reliant on external power supply if power is cut during a cyclone event. ![]() View project in Showcase |
Contract Dates | Start: 1 November 2012 Finish: April 2013 |
MHOV Project — Flatracks
Description of Product or Service Provided | Description of Contract: Design and build sixteen ISO 1C flatracks as per DMO specifications for Land 121, for the New Zealand Defence Force. ![]() |
Contract Dates | Start: 19 November 2014 Finish: January 2016 |
Australian Army — Supply of Waste Water Treatment Plant (WWTP) to AACAP 2019
Description of Product or Service Provided | Description of Contract: Supply, freight, commission, maintain and de-commission 28 kl Waste Water Treatment Plant for Army Construction Camp near Jigalong Community, Western Australia. Hire period of 4 months. ![]() |
Contract Dates | Start: February 2019 Finish: August 2019 |
DTSO Transportable Field Trials Laboratory (TFTL)
Description of Product or Service Provided | Description of Contract: Design and build a deployable double roll-out 20 ft module, to be used as a manned laboratory in remote South Australian desert locations. The module is self-contained and is fitted with a diesel generator, fresh and waste water supplies, electrical and data services and distribution, mounted computer server rack and cabinet to numerous outlets within the cabin space. The module also has provisions for removal of cargo, including mobile computer cases and boxed equipment. The module has two sides that roll out when deployed and rolls back into an ISO-compliant container for transport. The project was delivered on budget and on time. From signing of contract to delivery took 11 months. The module has been in service since October 2010. ![]() View project in Showcase |
Contract Dates | Start: 27 October 2009 Finish: October 2010 |
Agilent Technologies — Equipment Calibration Laboratory
Description of Product or Service Provided | Description of Contract: Design and build a deployable single roll-out 20 ft module, to be used as a manned laboratory to test and calibrate electronic equipment at customers' work sites. This module was fitted out with a complex array of electronic equipment, and when side rolled out, two personnel worked inside a stable environmentally controlled laboratory. The module was also provided with an external power connection, along with jacks to maintain a level platform. This project was delivered on budget and on time. From signing contract to delivery took four months. This module has been in service since October 2012. ![]() View project in Showcase |
Contract Dates | Start: 11 June 2012 Finish: October 2012 |
ADF Maritime Surveillance Tonga — Accommodation Module
Description of Product or Service Provided | Description of Contract: Design and modify a single 20 ft container to act as a deployable module to provide accommodation for six extra crew members required for extended trips by patrol boats operated by the Tongan Government for Pacific Region surveillance activities. The module includes two separate bedrooms, air conditioning and marine quality door and windows. The module is designed to be quickly installed and removed from the boat depending on operational requirements. ![]() |
Contract Dates | Start: 3 February 2016 Finish: mid 2016 |
25 tonne Crane Spreader Bar
Description of Product or Service Provided | Description of Contract: Design and build a crane spreader bar that is adjustable and can be included in the CES equipment for the Manitowoc Cranes CES Carriage and Stowage Solution. The spreader bar suits the configurations of all of the containers that are being transported and moved as part of the Land 121 project. ![]() |
Contract Dates | Start: November 2015 Finish: March 2017 |
Defence Innovation Hub — Army Innovation Day 2021 Condition Based Maintenance Software System (CBMSS)
Description of Product or Service Provided | Description of Contract: ECLIPS is developing an OEM agnostic, multi-fleet, Condition Based Maintenance (CBM) Software System (CBMSS). The CBMSS ingests condition data from a range of sources, including Health and Usage Monitoring Systems (HUMS) and will be integrated with SAP (Defence's future ERP system) for fleet management, logistics decision support and process automation. This enables improved Operational Availability by minimising Logistics Lag Time and Administrative Downtime, thereby making Army more effective. Successful implementation of CBMSS will also reduce Through Life Support costs, making Army more efficient. ![]() |
Contract Dates | Start: 27 October 2020 Finish: 2022 |
Defence Innovation Hub — Digitalisation of the Joint Modular Intermodal Logistics System (D-JMILS) Ph2
Description of Product or Service Provided | Description of Contract: Digitalisation of JMILS (D-JMILS) involves the integration of location and condition monitoring sensors using intrinsically safe RuBee magnetic near field communications to the Joint Modular Intermodal Logistics System (JMILS). JMILS is a series of modular, intermodal, scalable, interconnectable logistics packaging and platforms designed to move efficiently through the Defence supply chain and are compatible with Army’s Land 121 vehicles, including the HX77 ILHS truck and 40M. The aim of D-JMILS is to enable adaptive and focused logistics support through a digitalised and integrated packaging solution in order to improve equipment Operational Availability rates and reduce Through Life Support costs. D-JMILS will isolate and reduce the Logistic Delay and Administration Delay time that greatly impacts Operational Availability. ![]() |
Contract Dates | Start: 7 October 2019 Finish: 18 December 2020 |
Hanwha LAND 400-3 — Integrated Logistics Support Services Risk Mitigation Activity (RMA)
Description of Product or Service Provided | Description of Contract: Professional services to Hanwha Defense Australia for the provision of Integrated Logistics Support Professional Services for the LAND 400-3 Risk Mitigation Activity (RMA). ![]() |
Contract Dates | Start: 12 February 2020 Finish: 30 September 2021 |
Hanwha LAND 400-3 — Offboard Health and Usage Monitoring System (HUMS)
Description of Product or Service Provided | Description of Contract: The Offboard HUMS system has been developed to work with the vehicle onboard HUMS and will drive CBM activity. ![]() |
Contract Dates | Start: October 2020 Finish: April 2021 |
Hanwha LAND 400-3 — Vehicle Information Management System (VIMS)
Description of Product or Service Provided | Description of Contract: VIMS will be a key component of Defence’s Whole of Fleet Management (WFM) system for the LAND 400-3 Infantry Fighting Vehicle (IFV) capability. It will incorporate modelling capabilities including the use of Condition Based Maintenance (CBM) to predict maintenance actions and drive cost and schedule modelling. The VIMS has been developed to work with the vehicle HUMS and will drive CBM activity. ![]() |
Contract Dates | Start: February 2020 Finish: ongoing |
Camcode — Army Headquarters Codification and Unique Identification Program
Description of Product or Service Provided | Description of Contract: ECLIPS provided professional services to remediate codification data and uniquely identify a range of products for the Australian Army. Services included engineering required to inform codification. UID barcode labelling has included the labelling of almost 200,000 assets. This project, conducted at Army Headquarters (AHQ), is a foundation activity for the establishment of a digital supply chain, including the use of AIT. ECLIPS also supported Army’s policy updates in relation to DEF(AUST)1000C for packaging and labelling. ![]() |
Contract Dates | Start: January 2017 Finish: March 2020 |